The custom-designed boom provides an efficient solution for applications in both motorway maintenance and hedged parks.
E91 electric excavator
Two E91s work in parallel at a Swiss recycling company. One machine feeds old wood into the timber shredder. The other receives and uses its grab to sort a variety of waste.
Piles
Metre-length timber piles are being rammed onto the banks of Lake Constance to create a new port facility.
Mechanical cable laying
The Menzi Muck cable plough enables pipes to be laid in a single operation, whereby trenches are dug with the attachment and the pipe is laid without interruption.